{"id":81910,"date":"2026-07-30T09:51:59","date_gmt":"2026-07-30T06:51:59","guid":{"rendered":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/"},"modified":"2026-07-30T09:52:21","modified_gmt":"2026-07-30T06:52:21","slug":"on-site-solar-saudi-mega-projects","status":"publish","type":"post","link":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/","title":{"rendered":"On-Site Solar to Power 35% of Saudi Mega-Projects"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A new report by Boston Consulting Group reveals that Saudi Arabia&#8217;s mega-projects could generate up to 35% of their electricity demand using on-site solar.<\/p><p class=\"wp-block-paragraph\">The study, titled &#8220;Mega-Projects Powered by Renewables: A Practical Playbook for Saudi Arabia,&#8221; indicates that these decentralized installations can reduce electricity costs by up to 35%. This development comes as the Kingdom accelerates its efforts to meet Saudi Vision 2030 sustainability targets, which include sourcing 50% of its electricity from renewable sources by 2030. These initiatives are also expected to play a significant role in shaping the country&#8217;s <a href=\"\/category\/economy\/\">economy<\/a>.<\/p><h2 class=\"wp-block-heading\">Economic Benefits of On-Site Solar<\/h2><p class=\"wp-block-paragraph\">The report highlights that on-site solar can be deployed across rooftops, carports, and shading structures without requiring additional land. This approach allows developers to preserve architectural designs while generating clean energy. According to the analysis, developers can choose between asset-light models, such as Power Purchase Agreements (PPAs) that eliminate upfront capital, and own-and-operate models that offer higher long-term returns.<\/p><blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Saudi Arabia&#8217;s new cities represent a once-in-a-generation opportunity to build sustainable urban environments from the ground up. The economics are clear: developers can meet almost a third of their electricity demand, while simultaneously advancing the Kingdom\u2019s low-carbon urban development.&#8221;<\/p><cite>Edoardo Geraci, Managing Director &#038; Partner at BCG<\/cite><\/blockquote><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities-inline-1.webp\" alt=\"On-site solar panels installed on modern buildings in Saudi Arabia\"\/><\/figure><p class=\"wp-block-paragraph\">The own-and-operate model can deliver 35% to 50% higher long-term returns, though it requires initial capital and operational management. By integrating renewable infrastructure early in the design phase, developers can avoid the high costs associated with retrofitting. Additionally, these installations can power local infrastructure, including charging stations for the <a href=\"\/category\/automotive\/\">automotive<\/a> sector.<\/p><h2 class=\"wp-block-heading\">Varying Potential Across Building Types<\/h2><p class=\"wp-block-paragraph\">The generation potential varies significantly depending on the asset type. A single-family villa can meet approximately 50% of its annual electricity needs, producing about 35 MWh per year. In contrast, a mid-rise building with higher load density can meet about 15% of its annual demand, generating 190 MWh per year. These decentralized systems can also support localized networks of <a href=\"\/category\/smart-devices\/\">smart devices<\/a> to optimize energy consumption.<\/p><h2 class=\"wp-block-heading\">Regulatory Frameworks and Market Momentum<\/h2><p class=\"wp-block-paragraph\">Momentum for decentralized renewable energy is growing across the Kingdom. For instance, King Abdullah Economic City has an estimated 12.5 megawatt-peak of renewable capacity. This growth is supported by the Saudi Electricity Regulatory Authority&#8217;s self-consumption framework, which was introduced in 2022 to provide clear guidelines for behind-the-meter generation.<\/p><blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Beyond the compelling economics, renewable energy infrastructure offers something equally valuable: the opportunity to shape a distinctive identity for Saudi Arabia&#8217;s new cities. Solar canopies, building-integrated photovoltaics, and interactive energy features transform sustainability from a compliance requirement into a signature urban asset.&#8221;<\/p><cite>Peter Jameson, Managing Director &#038; Partner at BCG<\/cite><\/blockquote><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities-inline-2.webp\" alt=\"Solar energy infrastructure in a Saudi Arabian smart city\"\/><\/figure><h2 class=\"wp-block-heading\">Strategic Roadmap for Developers<\/h2><p class=\"wp-block-paragraph\">The report addresses common concerns regarding space requirements and visual impact, noting that modern solar solutions integrate directly into building facades and rooftops. To maximize returns, BCG recommends that developers conduct early energy assessments and engage with utilities and solar providers during the master planning stage. This proactive integration ensures long-term viability as regional carbon regulations continue to tighten.<\/p>","protected":false},"excerpt":{"rendered":"<p>A new BCG report shows that Saudi Arabia&#8217;s mega-projects can generate up to 35% of their electricity on-site, reducing costs and supporting Vision 2030 targets.<\/p>\n","protected":false},"author":2,"featured_media":81909,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_pr_autopilot_social_copy":"{\"x_hook\":\"35% of electricity demand in Saudi Arabia's future cities can be met through on-site solar installations, reducing costs by a similar margin according to a new report by BCG.\",\"x_takeaways\":\"Key Highlights:\\n\ud83d\udd39 On-site solar can meet up to 35% of total electricity demand in mega-projects\\n\ud83d\udd39 Single-family villas can generate 35 MWh annually, meeting 50% of their energy needs\\n\ud83d\udd39 Mid-rise buildings can generate 190 MWh annually, covering 15% of their demand\\n\ud83d\udd39 Own-and-operate models can deliver 35% to 50% higher long-term returns\\n\ud83d\udd39 Supported by the Saudi Electricity Regulatory Authority self-consumption framework\"}","_yoast_wpseo_opengraph_title":"On-Site Solar to Power 35% of Saudi Mega-Projects","_yoast_wpseo_opengraph_description":"A new report by Boston Consulting Group reveals that Saudi Arabia's mega-projects could generate up to 35% of their electricity demand using on-site solar installations.","_yoast_wpseo_opengraph_image":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","_yoast_wpseo_opengraph_image_id":81909,"_yoast_wpseo_twitter_title":"On-Site Solar to Power 35% of Saudi Mega-Projects","_yoast_wpseo_twitter_description":"A new report by Boston Consulting Group reveals that Saudi Arabia's mega-projects could generate up to 35% of their electricity demand using on-site solar installations.","_yoast_wpseo_twitter_image":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","_yoast_wpseo_twitter_image_id":81909,"_yoast_wpseo_primary_category":24,"_extra_hide_author_box":"1","_extra_featured_post":"0","_partner_post_id":112697,"footnotes":""},"categories":[26,24,443],"tags":[2176,1994,574,140,1215],"class_list":["post-81910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-automotive","category-economy","category-smart-devices","tag-audi-saudi-arabia","tag-bcg","tag-renewable-energy","tag-saudi-vision-2030","tag-solar-energy","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>On-Site Solar - Powering Saudi Mega-Projects | Saudi Shopper<\/title>\n<meta name=\"description\" content=\"On-site solar installations can meet up to 35% of electricity demand in Saudi Arabia&#039;s future cities, according to a new report by BCG.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"On-Site Solar - Powering Saudi Mega-Projects | Saudi Shopper\" \/>\n<meta property=\"og:description\" content=\"On-site solar installations can meet up to 35% of electricity demand in Saudi Arabia&#039;s future cities, according to a new report by BCG.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Saudishopper\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SaudiShopper\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-30T06:51:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-30T06:52:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"saudishopper\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ssict\" \/>\n<meta name=\"twitter:site\" content=\"@ssict\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"saudishopper\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/\"},\"author\":{\"name\":\"saudishopper\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/person\\\/75f95b68a450c611a56cdd18d6b2c667\"},\"headline\":\"On-Site Solar to Power 35% of Saudi Mega-Projects\",\"datePublished\":\"2026-07-30T06:51:59+00:00\",\"dateModified\":\"2026-07-30T06:52:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/\"},\"wordCount\":489,\"publisher\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/on-site-solar-saudi-cities.webp\",\"keywords\":[\"Audi Saudi Arabia\",\"BCG\",\"Renewable Energy\",\"Saudi Vision 2030\",\"Solar Energy\"],\"articleSection\":[\"Automotive\",\"Economy &amp; Business\",\"Smart Devices\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/\",\"name\":\"On-Site Solar - Powering Saudi Mega-Projects | Saudi Shopper\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/on-site-solar-saudi-cities.webp\",\"datePublished\":\"2026-07-30T06:51:59+00:00\",\"dateModified\":\"2026-07-30T06:52:21+00:00\",\"description\":\"On-site solar installations can meet up to 35% of electricity demand in Saudi Arabia's future cities, according to a new report by BCG.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#primaryimage\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/on-site-solar-saudi-cities.webp\",\"contentUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/on-site-solar-saudi-cities.webp\",\"width\":1200,\"height\":628,\"caption\":\"On-site solar panels installed on modern buildings in Saudi Arabia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/on-site-solar-saudi-mega-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"On-Site Solar to Power 35% of Saudi Mega-Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/\",\"name\":\"Saudishopper\",\"description\":\"Saudi ICT Shopper News\",\"publisher\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\",\"name\":\"Saudi ICT News\",\"alternateName\":\"Saudi ICT Shopper News\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/SSTrans.png\",\"contentUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/SSTrans.png\",\"width\":423,\"height\":165,\"caption\":\"Saudi ICT News\"},\"image\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SaudiShopper\",\"https:\\\/\\\/x.com\\\/ssict\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/person\\\/75f95b68a450c611a56cdd18d6b2c667\",\"name\":\"saudishopper\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b02621f0881cdcf27f6e1ea0dd3fac1d5934209dcb8becac4f4fffe5abf17ea?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b02621f0881cdcf27f6e1ea0dd3fac1d5934209dcb8becac4f4fffe5abf17ea?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b02621f0881cdcf27f6e1ea0dd3fac1d5934209dcb8becac4f4fffe5abf17ea?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g\",\"caption\":\"saudishopper\"},\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/author\\\/saudishopper\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"On-Site Solar - Powering Saudi Mega-Projects | Saudi Shopper","description":"On-site solar installations can meet up to 35% of electricity demand in Saudi Arabia's future cities, according to a new report by BCG.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/","og_locale":"en_US","og_type":"article","og_title":"On-Site Solar - Powering Saudi Mega-Projects | Saudi Shopper","og_description":"On-site solar installations can meet up to 35% of electricity demand in Saudi Arabia's future cities, according to a new report by BCG.","og_url":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/","og_site_name":"Saudishopper","article_publisher":"https:\/\/www.facebook.com\/SaudiShopper","article_published_time":"2026-07-30T06:51:59+00:00","article_modified_time":"2026-07-30T06:52:21+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","type":"image\/webp"}],"author":"saudishopper","twitter_card":"summary_large_image","twitter_creator":"@ssict","twitter_site":"@ssict","twitter_misc":{"Written by":"saudishopper","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#article","isPartOf":{"@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/"},"author":{"name":"saudishopper","@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/person\/75f95b68a450c611a56cdd18d6b2c667"},"headline":"On-Site Solar to Power 35% of Saudi Mega-Projects","datePublished":"2026-07-30T06:51:59+00:00","dateModified":"2026-07-30T06:52:21+00:00","mainEntityOfPage":{"@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/"},"wordCount":489,"publisher":{"@id":"https:\/\/saudishopper.com.sa\/en\/#organization"},"image":{"@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","keywords":["Audi Saudi Arabia","BCG","Renewable Energy","Saudi Vision 2030","Solar Energy"],"articleSection":["Automotive","Economy &amp; Business","Smart Devices"],"inLanguage":"en-US","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/saudishopper.com.sa\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/","url":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/","name":"On-Site Solar - Powering Saudi Mega-Projects | Saudi Shopper","isPartOf":{"@id":"https:\/\/saudishopper.com.sa\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#primaryimage"},"image":{"@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","datePublished":"2026-07-30T06:51:59+00:00","dateModified":"2026-07-30T06:52:21+00:00","description":"On-site solar installations can meet up to 35% of electricity demand in Saudi Arabia's future cities, according to a new report by BCG.","breadcrumb":{"@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#primaryimage","url":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","contentUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/07\/on-site-solar-saudi-cities.webp","width":1200,"height":628,"caption":"On-site solar panels installed on modern buildings in Saudi Arabia"},{"@type":"BreadcrumbList","@id":"https:\/\/saudishopper.com.sa\/en\/on-site-solar-saudi-mega-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/saudishopper.com.sa\/en\/"},{"@type":"ListItem","position":2,"name":"On-Site Solar to Power 35% of Saudi Mega-Projects"}]},{"@type":"WebSite","@id":"https:\/\/saudishopper.com.sa\/en\/#website","url":"https:\/\/saudishopper.com.sa\/en\/","name":"Saudishopper","description":"Saudi ICT Shopper News","publisher":{"@id":"https:\/\/saudishopper.com.sa\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/saudishopper.com.sa\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/saudishopper.com.sa\/en\/#organization","name":"Saudi ICT News","alternateName":"Saudi ICT Shopper News","url":"https:\/\/saudishopper.com.sa\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/logo\/image\/","url":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2020\/08\/SSTrans.png","contentUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2020\/08\/SSTrans.png","width":423,"height":165,"caption":"Saudi ICT News"},"image":{"@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SaudiShopper","https:\/\/x.com\/ssict"]},{"@type":"Person","@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/person\/75f95b68a450c611a56cdd18d6b2c667","name":"saudishopper","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6b02621f0881cdcf27f6e1ea0dd3fac1d5934209dcb8becac4f4fffe5abf17ea?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6b02621f0881cdcf27f6e1ea0dd3fac1d5934209dcb8becac4f4fffe5abf17ea?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6b02621f0881cdcf27f6e1ea0dd3fac1d5934209dcb8becac4f4fffe5abf17ea?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g","caption":"saudishopper"},"url":"https:\/\/saudishopper.com.sa\/en\/author\/saudishopper\/"}]}},"_links":{"self":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts\/81910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/comments?post=81910"}],"version-history":[{"count":1,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts\/81910\/revisions"}],"predecessor-version":[{"id":81911,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts\/81910\/revisions\/81911"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/media\/81909"}],"wp:attachment":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/media?parent=81910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/categories?post=81910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/tags?post=81910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}