{"id":83536,"date":"2026-09-02T10:30:02","date_gmt":"2026-09-02T07:30:02","guid":{"rendered":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/"},"modified":"2026-09-05T10:30:41","modified_gmt":"2026-09-05T07:30:41","slug":"datavolt-humain-neom-ai-data-center-oxagon","status":"publish","type":"post","link":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/","title":{"rendered":"DataVolt and HUMAIN Break Ground on 360 MW AI Data Center in NEOM"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Construction has officially begun on a new <strong>NEOM AI data center<\/strong> facility located in Oxagon, marking the start of a large-scale computational infrastructure project in Saudi Arabia. The project is being developed through an expanded partnership between digital infrastructure firm DataVolt and HUMAIN, a company owned by the Public Investment Fund (PIF).<\/p><p class=\"wp-block-paragraph\">According to reporting by <a href=\"https:\/\/www.telecompaper.com\/news\/humain-supports-datavolt-in-first-stage-of-3600-mw-ai-data-centre-at-oxagon-in-neom--1581263\" rel=\"nofollow noopener\">telecompaper.com<\/a>, the development will eventually scale to a total capacity of 360 megawatts (MW). The project brings together HUMAIN&#8217;s full-stack <a href=\"\/category\/ai\/\">artificial intelligence<\/a> capabilities with DataVolt&#8217;s background in financing, building, and managing critical digital facilities.<\/p><h2 class=\"wp-block-heading\">Development of the NEOM AI data center<\/h2><p class=\"wp-block-paragraph\">The initial phase of the development focuses on delivering 100 MW of power capacity dedicated to high-density computing workloads. Crews have started active construction on site, with the primary phase scheduled to become fully operational by 2028. This initial block represents roughly 28 percent of the total planned energy output across the entire computing campus.<\/p><p class=\"wp-block-paragraph\">The facility was formally presented during the LEAP26 technology conference in Riyadh. As computational demands rise, specialized facilities must accommodate advanced hardware configurations, high-voltage electrical distribution systems, and specialized cooling setups designed specifically for machine learning models.<\/p><h2 class=\"wp-block-heading\">Initial Capacity and Operational Timeline<\/h2><p class=\"wp-block-paragraph\">Under the operational roadmap, the site will progressively expand from its initial 100 MW stage to reach its complete 360 MW rating. The buildout reflects growing domestic investments in the Kingdom&#8217;s <a href=\"\/category\/economy\/\">digital economy<\/a> and enterprise technology infrastructure.<\/p><p class=\"wp-block-paragraph\">Furthermore, DataVolt is directing engineering resources to deliver the required operational resilience. The project ensures that local developers, enterprises, and institutions gain direct access to domestic computational capacity rather than relying solely on overseas server infrastructure.<\/p><h2 class=\"wp-block-heading\">Infrastructure Demands for Advanced Workloads<\/h2><p class=\"wp-block-paragraph\">Operating facilities of this scale requires dedicated utility planning, especially regarding electricity delivery and cooling circuits. NEOM representatives stated that advanced computing workloads depend directly on three foundational elements: power availability, physical infrastructure, and high-speed network connectivity.<\/p><p class=\"wp-block-paragraph\">Consequently, the Oxagon site incorporates scalable energy supply lines and water systems engineered to sustain sustained processing operations. Modern high-density server racks generate significant thermal output, necessitating modern industrial cooling approaches that maintain efficient power usage effectiveness ratios across all server halls.<\/p><h2 class=\"wp-block-heading\">Strategic Alignment with Digital Initiatives<\/h2><p class=\"wp-block-paragraph\">The establishment of the <strong>NEOM AI data center<\/strong> supports Saudi Arabia&#8217;s broader strategic framework for technological transformation. By building dedicated facilities locally, the Kingdom seeks to strengthen its position as a regional hub for data processing and computational research.<\/p><p class=\"wp-block-paragraph\">Meanwhile, commercial telecommunications networks and secure <a href=\"\/category\/cybersecurity\/\">cybersecurity<\/a> architectures will integrate directly into the complex as construction advances toward the 2028 completion target. This coordinated deployment establishes an operational base capable of servicing commercial, governmental, and scientific compute workloads across the region.<\/p>","protected":false},"excerpt":{"rendered":"<p>DataVolt and PIF-backed HUMAIN have started building a 360 MW AI data center in NEOM&#8217;s Oxagon, with an initial 100 MW phase opening in 2028.<\/p>\n","protected":false},"author":8,"featured_media":83535,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_pr_autopilot_social_copy":"{\"x_hook\":\"DataVolt and PIF-backed HUMAIN have broken ground on a 360 MW AI data center at Oxagon in NEOM, starting with a 100 MW first phase set for 2028.\",\"x_takeaways\":\"Key Details:\\n\ud83d\udd39 360 MW total planned capacity for AI computing\\n\ud83d\udd39 100 MW initial phase now under active construction\\n\ud83d\udd39 First phase scheduled to become operational in 2028\\n\ud83d\udd39 Located at Oxagon in NEOM with dedicated power lines\\n\ud83d\udd39 Jointly developed by DataVolt and PIF-backed HUMAIN\"}","_yoast_wpseo_opengraph_title":"DataVolt and HUMAIN Break Ground on 360 MW AI Data Center in NEOM","_yoast_wpseo_opengraph_description":"Work begins on Saudi Arabia's first dedicated AI data center campus in Oxagon, NEOM, delivering 100 MW of power capacity by 2028.","_yoast_wpseo_opengraph_image":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","_yoast_wpseo_opengraph_image_id":83535,"_yoast_wpseo_twitter_title":"DataVolt and HUMAIN Begin 360 MW AI Data Center in NEOM","_yoast_wpseo_twitter_description":"Construction starts on a 360 MW AI computing facility at NEOM's Oxagon, with initial 100 MW capacity operational in 2028.","_yoast_wpseo_twitter_image":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","_yoast_wpseo_twitter_image_id":83535,"_yoast_wpseo_primary_category":449,"_extra_hide_author_box":"","_extra_featured_post":"0","_partner_post_id":114618,"footnotes":""},"categories":[449,24],"tags":[711,6292,1015,1109,6293],"class_list":["post-83536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ai","category-economy","tag-ai-data-centers","tag-datavolt","tag-humain","tag-neom","tag-oxagon","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NEOM AI Data Center Starts | Saudi Shopper<\/title>\n<meta name=\"description\" content=\"DataVolt and HUMAIN break ground on the NEOM AI data center in Oxagon, targeting an initial 100 MW operational capacity by 2028.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NEOM AI Data Center Starts | Saudi Shopper\" \/>\n<meta property=\"og:description\" content=\"DataVolt and HUMAIN break ground on the NEOM AI data center in Oxagon, targeting an initial 100 MW operational capacity by 2028.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/\" \/>\n<meta property=\"og:site_name\" content=\"Saudishopper\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SaudiShopper\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-02T07:30:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-05T07:30:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Mohamed Ghamdi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ssict\" \/>\n<meta name=\"twitter:site\" content=\"@ssict\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mohamed Ghamdi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/\"},\"author\":{\"name\":\"Mohamed Ghamdi\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/person\\\/c91ff01097dcdc0d20ea79378eb83440\"},\"headline\":\"DataVolt and HUMAIN Break Ground on 360 MW AI Data Center in NEOM\",\"datePublished\":\"2026-09-02T07:30:02+00:00\",\"dateModified\":\"2026-09-05T07:30:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/\"},\"wordCount\":446,\"publisher\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/neom-ai-data-center-oxagon-construction.webp\",\"keywords\":[\"AI data centers\",\"DataVolt\",\"HUMAIN\",\"NEOM\",\"Oxagon\"],\"articleSection\":[\"Artificial Intelligence\",\"Economy &amp; Business\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/\",\"name\":\"NEOM AI Data Center Starts | Saudi Shopper\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/neom-ai-data-center-oxagon-construction.webp\",\"datePublished\":\"2026-09-02T07:30:02+00:00\",\"dateModified\":\"2026-09-05T07:30:41+00:00\",\"description\":\"DataVolt and HUMAIN break ground on the NEOM AI data center in Oxagon, targeting an initial 100 MW operational capacity by 2028.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/neom-ai-data-center-oxagon-construction.webp\",\"contentUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/neom-ai-data-center-oxagon-construction.webp\",\"width\":1200,\"height\":628,\"caption\":\"NEOM AI data center construction site at Oxagon with engineering teams\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/datavolt-humain-neom-ai-data-center-oxagon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DataVolt and HUMAIN Break Ground on 360 MW AI Data Center in NEOM\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/\",\"name\":\"Saudishopper\",\"description\":\"Saudi ICT Shopper News\",\"publisher\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#organization\",\"name\":\"Saudi ICT News\",\"alternateName\":\"Saudi ICT Shopper News\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/SSTrans.png\",\"contentUrl\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/SSTrans.png\",\"width\":423,\"height\":165,\"caption\":\"Saudi ICT News\"},\"image\":{\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SaudiShopper\",\"https:\\\/\\\/x.com\\\/ssict\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/#\\\/schema\\\/person\\\/c91ff01097dcdc0d20ea79378eb83440\",\"name\":\"Mohamed Ghamdi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74c52ae9ccb128bafec358a5e56b2f53c4de12681285f3ab3e85c351172859bc?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74c52ae9ccb128bafec358a5e56b2f53c4de12681285f3ab3e85c351172859bc?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74c52ae9ccb128bafec358a5e56b2f53c4de12681285f3ab3e85c351172859bc?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g\",\"caption\":\"Mohamed Ghamdi\"},\"url\":\"https:\\\/\\\/saudishopper.com.sa\\\/en\\\/author\\\/mgamdi\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NEOM AI Data Center Starts | Saudi Shopper","description":"DataVolt and HUMAIN break ground on the NEOM AI data center in Oxagon, targeting an initial 100 MW operational capacity by 2028.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/","og_locale":"en_US","og_type":"article","og_title":"NEOM AI Data Center Starts | Saudi Shopper","og_description":"DataVolt and HUMAIN break ground on the NEOM AI data center in Oxagon, targeting an initial 100 MW operational capacity by 2028.","og_url":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/","og_site_name":"Saudishopper","article_publisher":"https:\/\/www.facebook.com\/SaudiShopper","article_published_time":"2026-09-02T07:30:02+00:00","article_modified_time":"2026-09-05T07:30:41+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","type":"image\/webp"}],"author":"Mohamed Ghamdi","twitter_card":"summary_large_image","twitter_creator":"@ssict","twitter_site":"@ssict","twitter_misc":{"Written by":"Mohamed Ghamdi","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#article","isPartOf":{"@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/"},"author":{"name":"Mohamed Ghamdi","@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/person\/c91ff01097dcdc0d20ea79378eb83440"},"headline":"DataVolt and HUMAIN Break Ground on 360 MW AI Data Center in NEOM","datePublished":"2026-09-02T07:30:02+00:00","dateModified":"2026-09-05T07:30:41+00:00","mainEntityOfPage":{"@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/"},"wordCount":446,"publisher":{"@id":"https:\/\/saudishopper.com.sa\/en\/#organization"},"image":{"@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#primaryimage"},"thumbnailUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","keywords":["AI data centers","DataVolt","HUMAIN","NEOM","Oxagon"],"articleSection":["Artificial Intelligence","Economy &amp; Business"],"inLanguage":"en-US","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/saudishopper.com.sa\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/","url":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/","name":"NEOM AI Data Center Starts | Saudi Shopper","isPartOf":{"@id":"https:\/\/saudishopper.com.sa\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#primaryimage"},"image":{"@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#primaryimage"},"thumbnailUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","datePublished":"2026-09-02T07:30:02+00:00","dateModified":"2026-09-05T07:30:41+00:00","description":"DataVolt and HUMAIN break ground on the NEOM AI data center in Oxagon, targeting an initial 100 MW operational capacity by 2028.","breadcrumb":{"@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#primaryimage","url":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","contentUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2026\/09\/neom-ai-data-center-oxagon-construction.webp","width":1200,"height":628,"caption":"NEOM AI data center construction site at Oxagon with engineering teams"},{"@type":"BreadcrumbList","@id":"https:\/\/saudishopper.com.sa\/en\/datavolt-humain-neom-ai-data-center-oxagon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/saudishopper.com.sa\/en\/"},{"@type":"ListItem","position":2,"name":"DataVolt and HUMAIN Break Ground on 360 MW AI Data Center in NEOM"}]},{"@type":"WebSite","@id":"https:\/\/saudishopper.com.sa\/en\/#website","url":"https:\/\/saudishopper.com.sa\/en\/","name":"Saudishopper","description":"Saudi ICT Shopper News","publisher":{"@id":"https:\/\/saudishopper.com.sa\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/saudishopper.com.sa\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/saudishopper.com.sa\/en\/#organization","name":"Saudi ICT News","alternateName":"Saudi ICT Shopper News","url":"https:\/\/saudishopper.com.sa\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/logo\/image\/","url":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2020\/08\/SSTrans.png","contentUrl":"https:\/\/saudishopper.com.sa\/en\/wp-content\/uploads\/2020\/08\/SSTrans.png","width":423,"height":165,"caption":"Saudi ICT News"},"image":{"@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SaudiShopper","https:\/\/x.com\/ssict"]},{"@type":"Person","@id":"https:\/\/saudishopper.com.sa\/en\/#\/schema\/person\/c91ff01097dcdc0d20ea79378eb83440","name":"Mohamed Ghamdi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/74c52ae9ccb128bafec358a5e56b2f53c4de12681285f3ab3e85c351172859bc?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/74c52ae9ccb128bafec358a5e56b2f53c4de12681285f3ab3e85c351172859bc?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/74c52ae9ccb128bafec358a5e56b2f53c4de12681285f3ab3e85c351172859bc?s=96&d=https%3A%2F%2Fsaudishopper.com.sa%2Fen%2Fwp-content%2Fuploads%2F2020%2F12%2Fcropped-ss-icon--150x150.png&r=g","caption":"Mohamed Ghamdi"},"url":"https:\/\/saudishopper.com.sa\/en\/author\/mgamdi\/"}]}},"_links":{"self":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts\/83536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/comments?post=83536"}],"version-history":[{"count":1,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts\/83536\/revisions"}],"predecessor-version":[{"id":83537,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/posts\/83536\/revisions\/83537"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/media\/83535"}],"wp:attachment":[{"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/media?parent=83536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/categories?post=83536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/saudishopper.com.sa\/en\/wp-json\/wp\/v2\/tags?post=83536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}